Now showing items 1-2 of 2

    • Design project final report 

      De Castro, Jericho; Zhang, Pei; Wong, Peter; O'Connor, Brian (2012-02-24)
      The objective of this project is to design a composite modular floor and wall panel system for Composite Innovation Center (CIC) to be implemented in a temporary disaster relief structure. CIC completed the design and ...
    • Modular hip joint testing apparatus : final design report 

      Dueck, Jonathan; Sun, Guan; Toews, Gregory; Toth, Stephen (2012-02-24)
      This report details the design of a modular hip joint testing apparatus for the Concordia Hip and Knee Institute. Current methods of fatigue testing of artificial hip joints primarily focus on applying compressive axial ...