Morrison, Brian Melvin2012-08-272012-08-271969http://hdl.handle.net/1993/854835, [45] leaves :engThe benefit-cost ratio of a flood control project as a stochastic variable : the development of a Markovian flow generation model and its application to the evaluation of flood control benefitsmaster thesis